Mezzanine Floor In Leicestershire
Prime Workspace Solutions have recently completed a mezzanine floor installation on behalf of a Nottingham based fit out contractor for a project in Coalville, Leicestershire.
Great job by Prime Workspace Solutions, the mezzanine floor was installed on time as promised. Ben was really helpful through the design stage, his suggestions made sure the required office layout was achieved while adhering to Building Regulations.
Mike Bott
ClientProject Brief
The new mezzanine floor is to have offices constructed below and provide storage space above, allowing the remaining ground floor area to be used for production.
From the initial site survey the mezzanine was designed, manufactured and installed within a four week period, allowing the rest of the project to be completed within programme.
As well as supplying the mezzanine floor Prime Workspace Solutions also managed the Building Regulations application for the full warehouse fit out.
Specification
- Mezzanine Floor area 87m2
- Live load 4.8kN/m2
- Straight flight staircase with top landing
- Handrail and kicker to exposed edge
- Building Regulations application