Cantilever Racking In Birmingham

Prime Workspace Solutions have recently completed a cantilever racking installation for a steel stockholder based in the West Midlands.

The lads have finished the installation and done a cracking job. Many thanks to you and your team for the work and for fitting arms to the existing column at short notice.

Phil Cusack
Client

Project Brief

Relocate existing racking and provide new cantilever racking to allow materials in offsite storage to be brought back in house.

The new cantilever racking is designed to carry aluminium extrusion, steel bar and tube up to 6,000mm long.

From recieving the order the project was supplied and installed within a four week period. 

Specification

  • 2 x Double sided runs of cantilever racking
  • 1 x Single sided run of cantilever racking
  • All cantilever columns 5,600mm high complete with bolt on bases
  • 2 x Runs incorporating 1,200mm long cantilever arms x 700kgs SWL
  • 1 x Run incorporating 1,500mm long cantilever arms x 750kgs SWL